Quick answer: Compare restoration bids by matching the work—not just the total. Ask each contractor to identify included tasks, quantities, materials, exclusions, completion dates and payment terms. Verify required licenses and insurance separately. Request written explanations of major differences before choosing; the FTC specifically advises against automatically selecting the lowest bidder. (consumer.ftc.gov)
This guide is for U.S. homeowners comparing work after water, fire or storm damage. Licensing, permits and contract rules depend on your location. Use the checklist to organize questions, not to diagnose damage or decide whether a property is safe.
1. Give every contractor the same scope to price
Start with a shared description of the work you want priced. Iowa’s Attorney General recommends writing down your expectations before seeking estimates, including materials, permits, inspections, warranties, cleanup and payment questions. (iowaattorneygeneral.gov)
For a restoration project, turn that description into a room-by-room comparison sheet. Ask each bidder to address:
- Location: Which rooms, building surfaces and belongings are covered?
- Tasks: What will be assessed, protected, cleaned, removed, repaired or replaced?
- Quantities: What measurements support each task?
- Materials: What product, finish or material allowance is included?
- Endpoint: What exactly will be finished when this contract ends?
The CFPB recommends recording material quantities and quality, permit responsibilities, project dates and verbal promises in writing. Use those categories as the backbone of your comparison. (consumerfinance.gov)
Label project phases separately on your worksheet: emergency work, assessment, cleanup or drying, contents work, and reconstruction. Ask whether each phase is included, excluded or covered by another agreement.
A useful clarification request is:
“Please identify the work your price completes and the work I would still need to arrange afterward.”
Do not force contractors to copy one another’s proposed methods. If they disagree about what is necessary, ask each to explain the basis for the recommendation rather than treating the disagreement as a price difference alone.

2. Make exclusions, allowances and variable charges visible
Ask for a clearly labeled list of what the contractor will and will not do. The FTC’s contractor guide specifically identifies cleanup, trash hauling, material allowances and written verbal promises as contract details worth addressing. (bulkorder.ftc.gov)
For each applicable restoration task, request one of four labels:
| Label | What to ask |
|---|---|
| Included | Where is it described and priced? |
| Excluded | Who must arrange it, and when? |
| Allowance | What selection or quantity does the allowance cover? |
| Undetermined | What information is needed before it can be priced? |
Suggested questions include:
- Does debris removal include loading, hauling and disposal?
- Are contents moving, storage and return included?
- Does surface repair include preparation, primer and finish coats?
- Are permit fees and required inspections included?
- Are after-hours attendance or additional visits separately charged?
- If equipment is charged by time, what records support the duration and who approves extensions?
Treat these as questions, not assumptions that every project needs every service.
Ask each bidder to distinguish a fixed price from an allowance, estimated quantity or time-based charge. For anything variable, request the rate, charging unit, approval process and supporting records.
Practical check: Highlight every “as needed,” “by others” and “not included.” Send the highlighted list back for clarification before comparing totals.
3. Work through a side-by-side bid comparison
The following is a hypothetical illustration, not a real estimate, market-price guide or recommended restoration scope.
Imagine that two contractors have inspected the same water-damaged room. You want proposals covering the agreed cleanup work through finished repairs.
| Comparison point | Hypothetical Bid A | Hypothetical Bid B | Clarification needed |
|---|---|---|---|
| Overall description | “Water-damage restoration” | Room-specific task list | Ask A to define its endpoint |
| Equipment charges | Separately billed; duration unspecified | Initial period stated; extensions require approval | Ask both how duration is documented |
| Damaged wall materials | Removal included | Removal and replacement included | Request replacement pricing from A |
| Painting | Excluded | Defined surfaces included | Align the surfaces and finish |
| Debris | Bagging included | Hauling and disposal included | Clarify who removes A’s debris |
| Contents | Owner to clear the room | Moving and returning listed items included | Decide which arrangement you want |
| Hidden damage | “Extra if required” | Written change-order procedure | Request the same approval process |
| Closeout | Not described | Walkthrough and warranty documents listed | Define both contractors’ deliverables |
You cannot yet make a price-equivalent comparison. First, ask A to price the omitted work—or ask B for a clearly separated alternative matching A’s narrower scope.
Then compare:
- The revised price for the same agreed work.
- Remaining allowances or variable charges.
- Work you must purchase separately.
- Unresolved items that still prevent a dependable comparison.
Do not insert your own guessed prices for missing tasks. Mark them “unpriced—clarification required.”
This exercise does not establish which contractor is better. It identifies what still needs explaining. The FTC recommends asking for an explanation when estimates differ substantially. (consumer.ftc.gov)

4. Verify licenses, insurance and subcontractor responsibilities
Licensing requirements vary. The FTC advises checking with the local building department or consumer protection agency to establish what your location requires. It also recommends checking subcontractors’ current insurance and licenses where required. (bulkorder.ftc.gov)
Use the appropriate regulator rather than relying only on a logo or license number printed on a proposal:
- California: CSLB’s license lookup allows searches by license number, business name and personnel, and includes complaint-disclosure information. (cslb.ca.gov)
- Florida: DBPR advises verifying the state-issued license number and checking complaints. Its guidance explicitly states that incorporation as an LLC or corporation does not qualify a business to act as a contractor. (www2.myfloridalicense.com)
Ask the regulator whether the credential covers the proposed work and location. Save a dated copy of your verification.
For insurance, request current general liability and workers’ compensation documentation, or a valid exemption where applicable. Florida’s Insurance Consumer Advocate specifically recommends obtaining this documentation before signing a repair agreement. (myfloridacfo.com)
As a practical verification step, ask the insurance agent or insurer to confirm the named business, policy dates and relevant work. Ask what exclusions may matter rather than assuming that a certificate answers every coverage question.
Also identify who will supervise subcontractors, approve their work and handle problems. Put those responsibilities in the agreement.
5. Compare schedules, handoffs and completion documents
Require estimated start and completion dates in writing. The CFPB also recommends documenting who obtains permits and keeping copies of signed contracts, guarantees and warranties before work begins. (consumerfinance.gov)
Ask each contractor to separate:
- Earliest availability from a proposed start date.
- Working time from an estimated completion date.
- Its own tasks from work assigned to another contractor.
- Confirmed arrangements from unresolved dependencies.
For restoration, use handoff questions such as:
- Who authorizes the move from cleanup to reconstruction?
- What records will support that handoff?
- Who coordinates required inspections?
- How will delays or newly discovered conditions be communicated?
- Who protects completed work while another trade is present?
Request a proposed closeout list. Depending on the agreed scope, ask about progress photographs, equipment or drying records where applicable, inspection records, warranties and a final walkthrough.
These are requested deliverables—not a universal clearance standard or a declaration that the home is safe to occupy.
Practical check: Replace “complete restoration” with a written description of finished work and documents. California CSLB guidance similarly emphasizes detailed work descriptions, permit responsibility, completion dates and written warranties. (cslb.ca.gov)
6. Match payment terms to defined work—not assumptions about insurance
Compare the deposit, progress-payment milestones and final-payment conditions alongside the scope. The FTC advises against paying the entire project amount upfront and notes that state laws may limit deposits. (consumer.ftc.gov)
Ask the contractor to connect each progress payment to identifiable work. Keep receipts and use traceable payments rather than cash. Iowa’s Attorney General recommends these payment precautions. (iowaattorneygeneral.gov)
Before agreeing, clarify:
- Which work triggers each payment?
- How are allowances reconciled?
- When are variable charges invoiced?
- What must be delivered before final payment?
- Who answers payment questions involving subcontractors or suppliers?
State rules matter. For example, California CSLB guidance generally limits a home-improvement down payment to the lesser of US$1,000 or 10% of the contract price; its consumer guide notes a limited exception involving qualifying blanket performance and payment bonds. This is not a nationwide deposit rule. (cslb.ca.gov)
If insurance funds will help pay for repairs, check with your insurer and mortgage servicer about how and when funds are distributed. The CFPB recommends doing this before hiring. Do not assume the contractor’s payment schedule will match that timing. (consumerfinance.gov)
7. Require written changes and use a final interview checklist
Agree on the change-order process before work begins. In California, CSLB guidance requires changes to price or scope to be documented in a written change order signed by both parties before the change. Elsewhere, confirm local requirements and request the procedure in your contract. (cslb.ca.gov)
For each proposed change, request:
- The condition prompting it.
- Supporting photographs or assessment information where available.
- Work being added, removed or substituted.
- Added cost or credit.
- Schedule consequences.
- Written approval before the changed work proceeds.
Ask separately how urgent protective work will be authorized; do not leave that process undefined.
Use this final interview checklist with every bidder:
- Can you explain each difference between your scope and the other proposals?
- Which quantities, allowances and charges remain provisional?
- What must I arrange outside your contract?
- Which licenses, insurance documents and references can I verify?
- Who supervises the job and subcontractors?
- What could change the schedule?
- How will you obtain approval for extra work?
- What will I receive at completion?
Check references for similar projects, including communication, unexpected costs and completion. Those are questions the FTC recommends asking past customers. (bulkorder.ftc.gov)
Avoid choosing on total alone, accepting important verbal promises, or signing incomplete documents. The FTC flags pressure tactics and blank contract spaces as warning signs. Your final comparison should leave you able to explain what each price buys—and what it does not. (consumer.ftc.gov)